Back to glossary

Procurement Policy Note 002

PPN 002

UK Cabinet Office policy. Sets a mandatory minimum 10% social value weighting on central government contract evaluations.

TL;DR

  • What it is: UK Cabinet Office rule on social value in bids, published 13 February 2025, mandatory from 1 October 2025.
  • The 10% rule: at least 10% of the evaluation score goes to social value.
  • How you score it: five government missions, eight policy outcomes, and the standard reporting metrics beneath them.

Procurement Policy Note 002 (published 13 February 2025) is a UK Cabinet Office instruction. All central government departments, their executive agencies, and non-departmental public bodies must allocate a minimum 10% weighting of the total contract evaluation score to social value.

It applies to procurements commenced under the Procurement Act 2023 on or after 1 October 2025. For procurements commenced under the Act before that date, buyers could apply PPN 002 or continue with PPN 06/20 during the transition. PPN 06/20 has not been withdrawn.

The 5 PPN 002 missions

  • M1. Kickstart economic growth: three outcomes sit here, Fair work, Skills for growth, and Resilient, innovative and flexible supply chains.
  • M2. Make Britain a clean energy superpower: one outcome, Sustainable procurement practices.
  • M3. Take back our streets: one outcome, Support the reduction in crime through community cohesion.
  • M4. Break down barriers to opportunity: two outcomes, Employment and training for those who face barriers to employment, and Creating a pipeline of opportunities for the contract workforce.
  • M5. Build an NHS fit for the future: one outcome, Increasing productivity through physical and mental wellbeing.

These are the missions of the current model. COVID-19 recovery, Levelling Up, fighting climate change, equal opportunity and wellbeing were the five themes of the previous Social Value Model under PPN 06/20, and are not the PPN 002 missions. If a bid library still uses them, it predates this model.

Key facts

  • Minimum weighting: 10% of the total score, or an equivalent measurement (buyers can set higher).
  • Structure: five missions, eight policy outcomes, model award criteria beneath each outcome, standard reporting metrics beneath those.
  • How buyers use it: the buyer selects an outcome relevant to the subject matter of the contract. The Cabinet Office guide encourages selecting a single outcome except on the largest contracts.
  • Units, not money: the reporting metrics are counts, hours, litres, tonnes, square metres and pounds of direct spend. PPN 002 does not use monetary proxy values, and does not mention TOMs, which is a separate framework published by the Social Value Portal and required by many buyers outside central government.
  • Additionality: social value must be over and above the core deliverables of the tender or the contract.
  • Scope: procurements commenced under the Procurement Act 2023 by central government departments, their executive agencies and non-departmental public bodies. Mandatory for those commenced on or after 1 October 2025.
  • Relation to PPN 06/20: PPN 002 replaces PPN 06/20 (September 2020) for procurements in scope from 1 October 2025. PPN 06/20 is not withdrawn and continues to apply to procurements commenced under its regime.

How CrowAgent uses this term

CrowMark applies the PPN 002 mission mapping with a rules-based engine, not through AI, so the same contract profile always produces the same missions and you can override them. The flow is: contract profile, then mission selection, then measure recommendations from a curated catalogue aligned to National TOMs conventions, then scoring computed in code, then AI-assisted narrative drafting for a person to review. It is not a full National TOMs implementation. The language model never computes a figure.

Read more

PPN 002 complete guide → missions, scoring methodology, common mistakes, and evidence requirements.

Score your next bid to PPN 002

CrowMark drafts a cited social value narrative from bids you have already submitted, for your team to review and approve before it goes in.